MAF Engineering Ltd. logoMAF EngineeringStructural · Seismic · Civil
Serving Sea-to-Sky

Structural & civil engineers in Squamish

MAF Engineering Ltd. brings structural, seismic and civil engineering to homeowners, builders and developers across Squamish and the wider Sea-to-Sky corridor. Whether you are framing a new home in Garibaldi Highlands, adding a suite to a downtown mixed-use building, or working out a foundation for tricky estuary soils, our BC-registered P.Eng. delivers stamped drawings and the Schedule B and C field reviews a building permit calls for. With 25+ years of experience, we help Sea-to-Sky projects meet the BC Building Code without over-building.

Local engineering

Engineering for Squamish projects

Squamish sits at the head of Howe Sound where the Squamish River meets the sea, and that setting shapes nearly every structural decision here. Much of the developed valley floor — the downtown, the estuary edge and low-lying neighbourhoods — rests on soft alluvial and deltaic soils that carry genuine liquefaction potential in a major earthquake, while lots climbing the slopes toward the Stawamus Chief and Garibaldi Highlands often sit on granite bedrock or dense glacial till, so foundation design can change dramatically from one property to the next. The town's namesake outflow winds funnelling down the corridor make wind loading a real consideration, and snow loads climb with elevation as projects move up toward Whistler. Add the South Coast's high seismic hazard from the Cascadia subduction zone, and the predominantly wood-frame housing, the growing multi-family and mixed-use downtown builds, and the breweries and light-industrial shops all benefit from careful lateral and gravity design rather than code-minimum assumptions.

How we help in Squamish

  • Seismic design and retrofit for the high-hazard South Coast
  • Foundations for variable estuary soils and bedrock lots
  • Wind and snow load design for the Sea-to-Sky climate
  • Cold-formed steel for multi-family and mixed-use builds
  • Schedule B and C letters of assurance and field review